Answer ( 1 )

  1. Set the temperature of thr rubber box to 150-160° C,unload the pressure of the rubber pump,disassemble the hose and the glue gun,and drain the residual glue in the hot melt glue machine,drain the glue from the tank and remove the filter from the tank and the fliter near the drain…

Leave an answer

Browse
Browse